Commit Graph

7 Commits

Author SHA1 Message Date
1b17ccda91 internal/system: optional op check parallelism
The PipeWire Op check cannot be made parallel due to the OS interaction.

Signed-off-by: Ophestra <cat@gensokyo.uk>
2025-12-07 17:31:10 +09:00
d837628b4c internal/system: remove ineffectual join reverting wayland
Removing the pathname socket used to be handled separately, now it is done during the Close call.

Signed-off-by: Ophestra <cat@gensokyo.uk>
2025-12-07 00:43:50 +09:00
aab92ce3c1 internal/wayland: clean up pathname socket
This is cleaner than cleaning up in internal/system as it covers the failure paths.

Signed-off-by: Ophestra <cat@gensokyo.uk>
2025-11-19 06:37:04 +09:00
61972d61f6 internal/wayland: reimplement connect/bind code
The old implementation is relocated to system/wayland/deprecated.go.

Signed-off-by: Ophestra <cat@gensokyo.uk>
2025-11-16 01:23:16 +09:00
fe40af7b7e internal/wayland: relocate connection struct
This interface is getting replaced, so relocating it to the deprecated wrapper package before working on its replacement.

Signed-off-by: Ophestra <cat@gensokyo.uk>
2025-11-15 23:25:46 +09:00
a91920310d internal: relocate packages
Signed-off-by: Ophestra <cat@gensokyo.uk>
2025-11-15 13:58:34 +09:00
4e7aab07d5 internal/system: relocate from system
These packages are highly specific to hakurei and are difficult to use safely from other pieces of code.

Their exported symbols are made available until v0.4.0 where they will be removed for #24.

Signed-off-by: Ophestra <cat@gensokyo.uk>
2025-11-13 01:17:47 +09:00